Honey harvesting overall bought
Projects
Apiary Coordinator
Assets and Inventory
brocken beds in jangu welded
Broken beds in Jangu renovated
New metallic beds bought
Reception chair repaired
Circle Rep
extetion cable for jamaica found and returned back
New padlocks bought for the living room
Construction Steward
All building equipments kept and managed
Main hall stage reinnovated
New ecosan door purchased
Reception window repaired
Electricity infrastructure
All Jangu International security lights reinstalled and water pipes got supports
circuit breaker bought and installed at the pitch
Ex ray tube bought for cable inspection
Extensions intalled in mainhall
Faul tsockets in UK are rectified and repaired
LIGHTS IN PACIFIC AND ECOSAN RE INSTALLED
Lights on the velendor of Africa provided
Main hall lights reinstalled
Mema,s security Lights installed
Security light at girls' block relocated in the right place
Security lights for pacific and Africa worked on and replaced
security lights reinstalled at asian block
Sina village water cooking points installed
Sockets and extension bought and installed in Cameron and India
Sockets for heavy gargets bought and installed in the main hall
Sockets in Iraq enclosed and repaired
Sockets outlet installed in Sweden
submetres are bought for different projects to save electricity
Trapps and meat for trapping rats int the control room
Wood dust put in the manual halls
Food planner
food menu for the month revised and shared with the community member
Number of people accessing food recorded and shared with all cook coordinators
Games and Sports Steward
Football poles constructed using bootstrapping approach.
Incinerator
All Jangu plastic dust binswheels bought
Bottle guard built at the incenerator
Budget for new waste bins made.
Bush around the incinerator cleared
Cage for plastic at the incinerator made
Canteen and boys trashbins purchased or repaired
Dust bin guard made
dust bins in jangu are re labeled
Dust bins labelled and one painted
Glassbottle house rebulit using wood
Glass bottle house re innovated
Incenerator surounding cleared every month
incinerator area cleared of all wastes
monthly herbscides for the incinerator bought
New dust bins bought
Organic manuer made from organic waste at the incenerator
Plastic storage cage built at the incinerator
Rack for drying waste at the incinerator made
strategy on proper disposal of pads
Terminites removed from the incinerator
waste disposal mechanism developed and shared in the sustainability circle
Waste organic pit at the incenerator emptied
Waste sorting provision realised at the incenerator
Ways of clearing waste at the incenerator explored
Wheelbarrow for taking waste to the incinerator bought
Individual Initiative
livingroom window repaired
STMwith sustainability circle lead held regarding on Eco sun toilets
water gauter pipes bought
Rabbit Farming
New cross breeds of rabbits bought
cook coordinator
Big spoons for measuring rice and sugar
Books for cook coordinators purchased
Kitchen door repaired
Kitchen padlocks bought
knives for jangu kitchen bought
Middle fire place repaired
Protecting serving equipment are brought and accessed to kitchen role fillers
Servers outfits perchesed and given to all food servers
Special time meeting between community and food planner and cook coordenater
Turplin for covering food when are transporting perchesed