All building equipments kept and managed
Projects
All Jangu International security lights reinstalled and water pipes got supports
All Jangu plastic dust binswheels bought
Big spoons for measuring rice and sugar
Books for cook coordinators purchased
Bottle guard built at the incenerator
brocken beds in jangu welded
Broken beds in Jangu renovated
Budget for new waste bins made.
Bush around the incinerator cleared
Cage for plastic at the incinerator made
Canteen and boys trashbins purchased or repaired
circuit breaker bought and installed at the pitch
Dust bin guard made
dust bins in jangu are re labeled
Dust bins labelled and one painted
Ex ray tube bought for cable inspection
Extensions intalled in mainhall
extetion cable for jamaica found and returned back
Faul tsockets in UK are rectified and repaired
food menu for the month revised and shared with the community member
Football poles constructed using bootstrapping approach.
Glassbottle house rebulit using wood
Glass bottle house re innovated
Honey harvesting overall bought
Incenerator surounding cleared every month
incinerator area cleared of all wastes
Kitchen door repaired
Kitchen padlocks bought
knives for jangu kitchen bought
LIGHTS IN PACIFIC AND ECOSAN RE INSTALLED
Lights on the velendor of Africa provided
livingroom window repaired
Main hall lights reinstalled
Main hall stage reinnovated
Mema,s security Lights installed
Middle fire place repaired
monthly herbscides for the incinerator bought
New cross breeds of rabbits bought
New dust bins bought
New ecosan door purchased
New metallic beds bought
New padlocks bought for the living room
Number of people accessing food recorded and shared with all cook coordinators
Organic manuer made from organic waste at the incenerator
Plastic storage cage built at the incinerator
Protecting serving equipment are brought and accessed to kitchen role fillers
Rack for drying waste at the incinerator made
Reception chair repaired
Reception window repaired
Security light at girls' block relocated in the right place
Security lights for pacific and Africa worked on and replaced
security lights reinstalled at asian block
Servers outfits perchesed and given to all food servers
Sina village water cooking points installed
Sockets and extension bought and installed in Cameron and India
Sockets for heavy gargets bought and installed in the main hall
Sockets in Iraq enclosed and repaired
Sockets outlet installed in Sweden
Special time meeting between community and food planner and cook coordenater
STMwith sustainability circle lead held regarding on Eco sun toilets
strategy on proper disposal of pads
submetres are bought for different projects to save electricity
Terminites removed from the incinerator
Trapps and meat for trapping rats int the control room
Turplin for covering food when are transporting perchesed
waste disposal mechanism developed and shared in the sustainability circle
Waste organic pit at the incenerator emptied
Waste sorting provision realised at the incenerator
water gauter pipes bought
Ways of clearing waste at the incenerator explored
Wheelbarrow for taking waste to the incinerator bought
Wood dust put in the manual halls